ASTM A105 Carbon Steel Forged Flange

Product Details
Customization: Available
Standard: ANSI, DIN, JIS
Type: Welding Flange
Still deciding? Get samples of US$ 3/Set
Request Sample
Trading Company

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
20
Year of Establishment
2010-01-19
  • ASTM A105 Carbon Steel Forged Flange
  • ASTM A105 Carbon Steel Forged Flange
  • ASTM A105 Carbon Steel Forged Flange
  • ASTM A105 Carbon Steel Forged Flange
  • ASTM A105 Carbon Steel Forged Flange
  • ASTM A105 Carbon Steel Forged Flange
Find Similar Products

Basic Info.

Structure
Flanges
Connection
Welding
Manufacturing Way
Forging
Transport Package
Sea Worthy Plywood Cases
Specification
DN15 to DN1400mm
Trademark
QIF/I-FLOW
Origin
China
Production Capacity
10000pieces/Month

Product Description

ASTM A105 carbon steel forged flange

Types: weld neck, slip-on, threaded, lap-joint, socket welding and blind 
Manufacturing standards: API, ANSI, BS, JIS, UNI, MSS and SP
Size: from 1/2 inch to 56 inches (DN 15 to DN 1,400mm)
Pressure: from ANSI class 150 to 2,500
Materials: A105, LF2, F304, F304L, F316, F316L and Q235 steel

 

1.Basic Information

Standard

ASME B16.47,B16.5

DIN2527,DIN2543,DIN2631,DIN2633,DIN2642,DIN2573 etc

JIS B2220,BS4504, EN1092-1, GOST12820-80 etc

Material

Carbon Steel

A105, A216 WCB, A352 LCB A694 F42, etc

Alloy  Steel

A182 Gr. F11.Cl.2, 12Cr1MoV, 15CrMo, P91, P22, 10CrMo910 etc

Stainless Steel

  304 ,304L,316 ,321, 316L  347H etc

Minimum Order Quantity

50 Pieces

Type

WN-RTJ Flange, WN-RF Flange, SO-RF Flange, SO-FF Flange,

LF/SE-RF Flange, TH-RF Flange, SW-RF Flange, IF-RF Flange,

IF-RTJ Flange, Blind Flange, Anchor Flange, Orifice Flange etc

Dimension

1/2'' --- 48'' or DN15---DN1200 (Other sizes upon request)

Class

150LB, 300LB, 400LB,600LB,900LB, 1500LB, 2500LB


    

ASTM A105 Carbon Steel Forged Flange

ASTM A105 Carbon Steel Forged Flange



ASTM A105 Carbon Steel Forged Flange
ASTM A105 Carbon Steel Forged Flange
ASTM A105 Carbon Steel Forged Flange
ASTM A105 Carbon Steel Forged Flange
ASTM A105 Carbon Steel Forged Flange



FAQ

1.Can I have a sample order for valve?
A: Definitely Yes.We welcome sample order to test and check quality. Mixed samples are acceptable.

2. Can you OEM or ODM?
A:Yes, we have a great research & development team. The products can be made according to your request.

3. Can you provide the relevant documentation and certificate?
A:Yes, we can provide you with the documentation and certificate you need ,IS09001:2000 international quality system certification,(CE)certification of the European Community, Det Norske Veritas (DNV) factory certification, Lloyd's Register (LR) factory certification, China Classification Society (CCS) quality system certification and the FM and UL certification of the US, Bureau Veritas(BV) ,American Bureau of Shipping(ABS) etc.Of course we can also provide you the test Report; Certificate of Material Analysis; Certificate of Origin; and other export documents which required.

4.Can you do the design for us?
A:yes.Please send us high resolutionimages,your logo and other materials needed . We will send you finished files for confirmation.

5.How to proceed an order for valve?
A: Step1 let me know your requirements or application. Step 2 We quote according to your requirements or our suggestions. Step 3 Customer confirms the samples and places deposit for formal order. Step 4 We arrange the prodution.

6.What is your terms of delivery?
A: We accepte EXW,FOB,CIF,etc. You can choose the one which is the most convenient for you.

7.What's the package and how do you ship the goods?
A: Usually is wood pallet as your requst. We usually ship by sea.Airline shipping is also optional.

8. How to deal with after sales ?
A: warranty time : 12 months from the shipment ; and we will be responsible for all the quality problems. Quality control : High quality mold./Raw materials control/Production process quality control/Final inspection/Water testing (no leaking).

9. What is the average lead time?
A:For samples, the delivery time is about 2-5 days. For mass production, the lead time is about 15-60 days after receiving the deposit payment. we can provide production schedule and related photos every two weeks. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products.If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate our production plan to your needs.

10. Why choose us?

A:1 Genuine produces with excellent quality and competitive price. 2 Cooperating with the customers all over the world more than 60 countries and regions, and knowing the markets very well. 3.We have been specializing in flow control area for more than 10 years. Everyone can be rest assured working with us. 4 After-Services will be highly-satisfing. Any problems and feedbacks will be answered in a short of time.

11: How can I trust you and your company?

A: We are a verified supplier and creditable company on alibaba, we are focusing on the long term relationship with customers, we have worked with thousands of customers since company built 10 years ago, Including Fortune 500 companies. customers always make highly complimentary remarks.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier